Roosevelt Manor, NJ

stone backfill around concrete pipes
compaction of stone in infiltration pad
non woven geotextile acts as a seperator in underground stormwater infiltration system.
Splash pad installed at inlet pipe for stormwater detention system to prvent scour and erosion.
Stormwater detention system manhole enables acces for maintenance and inspection crews.
Concrete lid with lifting lugs for stormwater detention vault.
Liner placement for stormwater management.
Pipe boot construction to prevent migration of soils into infiltration system which will reduce permeability.
stone porosity provides watrer storage within pores.
Inlet structure for underground stromwater detention system.
stone compaction limits subsidence of road surface.
GRS walls exhibit no deflection when loaded with surcharge. HS-20 loads from vehicles represent live lods and soil overburden represents dead loads. AASHTO factor or safety are applied to the loads for the bridge deck design.
Stormwater drains from cistern into leach field.
FHWA and AASHTO designed dridge deck is placed on top of GeoStorage chamber.
GeoStorage System pipes water to outlet control structure with orifices and overflow weir.
stormwater chamber manhole
Integrated Bridge System roof placement over stormwater cistern.
access road into detention system.
Installation of GeoStorage detetnion system roof.
bridge panel installaion for roof of infiltration cistern.
Finished product of stormwater detention system
geotextile filter surrounding stormwater infiltration system.
asphalt parking lot above underground retention system.
Breidge seat bearing of integrated bridge system used for stormwater detention.
Inspection and Maintenance of undergound stormwater systems critical to avoid clogging of infiltration bed floor.
Manhole for stormwater chamber below parking lot.
Geomembrane Installation typical for a stormwater system located over karst limestone.
Geostorage logo

Office: 732.741.5015
Cell: 732.865.3635
Email: tsheridan@geostoragecorp.com

Address:
15 Edgewood Rd
Rumson, NJ 07760

Start A Project

Copyright © 2023 Geostorage Corp.
All Rights Reserved. | Design by @paulcasperjr